Scaffolding Floor Adjustable Light Weight Steel Props Jack In Indore
Product Description
Scaffolding Floor Adjustable Light Weight Steel Props Jack In Indore
Advantage:
1.Simple structure,simple erection.
2.High efficiency with strong loading capacity.
3.With galvanized or painted surface(endurable).
4.Widely applied in proping system such as consturction,plants and bridge etc.
Light Duty Prop -Spanish Prop
Light Duty Prop-Italian Prop
Specifications
Name | steel prop/ASGM/JIS/BS/DIN Standard Adjustable Scaffolding Steel post shore |
Place of origin | Tianjin ,China(Mainland) |
Size | Inner Tube Diameter (mm) | Outer Tube | Adjuatable | Wall Thickness |
(more customized size avilable) | 40 | 48/56 | 800-1250 | 1.5-2.5 |
1550-2500 |
2200-2500 |
2200-4500 |
Raw material | Q235(STK400)/Q345(STK500) |
Sturcture | top plate ,base plate,inner tube ,outer tube,hole ,pin,nut ,sleeve |
Surface treatment | painted,powder coated, electro galvanized or hot dip galvanized |
Color | orange,dark,red,blue,oras your request |
Certification | SGS,CE,ISO9000 |
Tecnique | ERW(Electric Resistance Welding) |
Payment | L/C at sight;T/T30% deposit |
Package | Packed in bulk or in bundle,shipped by container Or as your request |
Production Capacity | 100000 pcs /month |
Accessories of Steel Prop
Produce Process
Packaging & Shipping
Packed in bulk or in bundle. Shipped by container
FAQ
- - - 1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
- - - 2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
- - - 3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time?
A: 15-28 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,TSX Group do domestic market and export business.
- - - 6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
- - - 7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
- - - 8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) Scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139
(3) Steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction Metal Formwork
Contact Us
Senior Manager -TSX Scaffolding & Formwork Group
Haitai Xinxi Guangchang Nankai Dist Tianjin China
Tel: +86/ Skype: live:jane_4050
Mobile/Wechat: +86
WhatsApp: 0086
Web:
Manufacturer of Scaffolding and Formwork Products